| S.N. |
Name
of Project |
Name
of Client |
Department |
Status |
1
|
Greening of Commonwealth Games
|
|
CCSP
|
Proposal submitted
|
2
|
A Road Map for introduction of Production Tax Credits for Renewables in India for MNRE, GoI.
|
MNRE, GoI
|
CCSP
|
Completed
|
3
|
Renewable Energy Vision Document – 2020 for Union Territory of Puducherry (3 Reports)
|
Renewable Energy Agency, Puducherry, Govt of Puducherry
|
CCSP
|
Completed
|
4
|
Integrated RE based development in Himalayan Region
|
MNRE
|
CCSP
|
Proposal submitted
|
5
|
Capacity building and strengthening of State Nodal Agencies
|
MNRE / USAID
|
CCSP
|
Proposal submitted
|
6
|
Externalities of Conventional Power Generation
|
|
CCSP
|
Proposal submitted
|
7
|
Policy and Regulatory Framework for Kosovo
|
World Bank
|
CCSP
|
Short listed
|
8
|
Renewable Energy Development in India – Policy and Regulatory Issues
|
USAID
|
CCSP
|
Ongoing
|
9
|
Creating Clean Energy Technology Action Plans for 3 states in India
|
UK-FCO
|
CCSP
|
Ongoing
|
10
|
Creating a Carbon Neutral Company
|
Vestas India Ltd
|
CCSP
|
Completed
|
11
|
3-year comprehensive consulting support to MERC for developing Regulatory Policy for R.E. in Maharashtra
|
MERC, Mumbai
|
CCSP
|
Ongoing
|
12
|
Research study on model tariff and incentive structures for solar power generation (PV and Thermal)
|
MNRE, GoI
|
CCSP
|
Completed
|
13
|
Integrated development of Durbuk block in Ladakh using RE resources: Final Evaluation
|
Indo Canadian Environment Facility (ICEF)
|
CCSP
|
Completed
|
14
|
Integrated Energy Policy of the Govt of India (Policy intervention)
|
WISE Initiative
|
CCSP
|
Completed
|
15
|
Possibilities of Introduction of Renewable Energy Certificate Schemes in India
|
Baker and McKenzie, Australia / Asia Pacific Partnership
|
CCSP
|
Completed
|
16
|
Study of renewable energy based micro-grids in Indian villages
|
New Energy Foundation, Japan
|
CCSP
|
Completed
|
17
|
‘Public Cost of Conventional Electricity Generation in India’ for Indian Wind Turbine Manufacturers Association.
|
Indian Wind Turbine Manufacturers Association.
|
CCSP
|
Completed
|
18
|
Assistance to Total Energy Security Plan of Kerala
|
Kerala Government
|
CCSP
|
Ongoing
|
19
|
Consultancy service on development of RE policy in the state of Orissa and determination of tariff for renewable sources of energy including co-generation
|
OERC
|
CCSP
|
Short listed
|
20
|
Fixation of intra state electricity trading margin for Maharashtra
|
Maharashtra Electricity Regulatory
Commission
|
CRRP
|
Completed
|
21
|
Assessment of Renewable Energy potential in Indian states, the RPO trajectory and its impact on Tariff
|
Forum of Regulators (FoR)
|
CRRP
|
Short listed
|
22
|
Framing of RE power procurement Regulation and determination of tariff for Renewables
|
Punjab State Electricity Regulatory
Commission
|
CRRP
|
Short listed
|
23
|
Tariff determination for grid connected solar power projects in Maharashtra
|
Maharashtra Energy Development
Agenc
|
CRRP
|
Completed
|
24
|
Assessment of options for sale of electricity from proposed wind farm project in the state of Tamil Nadu
|
The Converging World Renewable Energy Ltd
|
CRRP
|
Completed
|
25
|
Consultancy Support for Regulatory assistance for determination of tariff for Waste-to-Energy Power Project in Maharashtra.
|
Organic Recycling Systems Pvt. Ltd
|
CRRP
|
Completed
|
26
|
Possibilities of Introduction of Renewable Energy Certificate Schemes in India (Asia-Pacific Partnership Project)
|
Australian Government
|
CRRP
|
Completed
|
27
|
Consultancy service on RE tariff determination, RPS fixation and RE policy formulation for the state of Orissa
|
Orissa Electricity Regulatory
Commission
|
CRRP
|
Completed
|
28
|
3-year comprehensive consulting support to MERC for developing Regulatory Policy for R.E. in Maharashtra
|
Maharashtra Electricity Regulatory
Commission
|
CRRP
|
Completed
|
29
|
Impact of Renewable Energy Certificate on RE market in India
|
General Electric, Bangalore
|
CRRP
|
Ongoing
|
30
|
Consultancy Support for Regulatory assistance for determination of tariff for Waste-to-Energy Power Project in Karnataka.
|
Organic Waste India Pvt. Ltd.
|
CRRP
|
Ongoing
|
31
|
Inputs / Comments on Hand book on “Best practices for successful deployment of RE in India (prepared under APPCC)
|
United State Energy Association
(USEA)
|
CRRP
|
Completed
|
32
|
Establishing Regulatory Framework For Renewable Energy Sources in KOSOVO
|
World Bank
|
CRRP
|
Short listed
|
33
|
Preparation of Detailed Project Report, Financial Model, Expression of Interest/Tender Document and analysis thereof for setting up of 5MW grid connected demonstration solar power project at Sautada, Tal.:Patoda, Dist.:Beed in Maharashtra
|
Maharashtra Energy Development Agency (MEDA)
|
CSE
|
Ongoing
|
34
|
Determination of Model Tariff for grid connected Solar power projects in India
|
MNRE
|
CSE
|
Completed
|
35
|
Preparation of policy map for accelerated solar power development in India
|
MNRE
|
CSE
|
Completed
|
36
|
Techno-economic Evaluation of Solar Power Generation Technologies in India and Preparation of Detailed Project Report
|
GVK Power & Infrastructure Ltd
|
CSE
|
Completed
|
37
|
Techno-economic Assessment of Solar Energy Technologies
|
Suzlon Infrastructure Service Ltd
|
CSE
|
Completed
|
38
|
Feasibility Studies for Development of 25 MW
Solar Thermal Power Plant at Singrauli & Rihand
|
National Thermal Power Corporation (NTPC)
|
CSE
|
Completed
|
39
|
Feasibility Studies for 5/10 MW Solar Power
Projects in Rajasthan
|
PDCORE Limited, Jaipur
|
CSE
|
Completed
|
40
|
Technology & Resource Assessment and Development of Framework for Grid Interfaced Solar Power Projects in Maharashtra
|
Maharashtra Energy Development Agency (MEDA)
|
CSE
|
Ongoing
|
41
|
Consultancy services for 188 MW solar power projects for preparation of Detailed Project Report, Financial Modeling, Implementation Schedule and Tendering process including maintenance contract
|
Maharashtra State Power Generation Company Ltd.
|
CSE
|
Ongoing
|
42
|
Retainer consultancy for developing 100MW Solar power projects
|
Anurav Power Private Ltd.
|
CSE
|
Ongoing
|
43
|
Preparation of Roadmap for Solar Energy Development in Tamilnadu
|
Tamil Nadu Electricity Development Agency & CII
|
CSE
|
Ongoing
|
44
|
Organized the first ever Solar Conference and Exhibition in India titled ‘Solar India 2007’ at Bangalore. More than 400 delegates and 36 Exhibiters Participated.
|
WISE
|
CSE
|
Completed
|
45
|
Detailed Project Report preparation for 10 MW Solar Farm
|
Suzlon Infrastructure Service Ltd
|
CSE
|
Ongoing
|
46
|
Training Programme for Wind Power Professional on ‘Failure Mode Effect Cause Analysis’ (March 2008)
|
Vestas Wind Technology India Pvt. Ltd
|
CWP
|
Completed
|
47
|
Organized and conducted an International training programme on ‘Wind Farm Design & Optimization’ in association with Garrad Hassan and Partners Limited, UK
|
Major wind farm operators, developers, owners, researchers, investors and financial institutions associated with wind power sector in Indis
|
CWP
|
Completed
|
48
|
Fixation of intra state electricity trading margin for Maharashtra
|
MERC
|
CWP
|
Completed
|
49
|
Induction Training Programme for Wind Power Professional (August 2007)
|
Vestas Wind Technology India Pvt. Ltd
|
CWP
|
Completed
|
50
|
Wind power market survey
|
Confidential
|
CWP
|
Completed
|
51
|
Wind Turbine Manufacturing tie-up for major corporate house in India
|
Confidential
|
CWP
|
Completed
|
52
|
Training Programme for Wind Power Professional on ‘Power Factor Improvement & Balance of Plant Management’
|
Vestas Wind Technology India Pvt. Ltd
|
CWP
|
Completed
|
53
|
Training Programme for Wind Power Professional on ‘Wind Power Project Development’ (Nov 2007)
|
Vestas Wind Technology India Pvt. Ltd
|
CWP
|
Completed
|
54
|
Wind Turbine Blade Market in India 2009-2013: A market survey report
|
Confidential
|
CWP
|
Completed
|
55
|
Induction Training Programme for Wind Power Professional (March, 2008)
|
Vestas Wind Technology India Pvt. Ltd
|
CWP
|
Completed
|
56
|
Induction Training Programme for Wind Power Professional (June 2008)
|
Vestas Wind Technology India Pvt. Ltd
|
CWP
|
Completed
|
57
|
Assessing the potential and implications for repowering of wind turbines at two sites viz. Aralvoimozhi and Palghat pass in Tamil Nadu ( March 2008- Oct 2008)
|
Ministry of New and Renewable Energy, GOI
|
CWP
|
Completed
|
58
|
Induction Training Programme for Wind Power Professional (August, 2008)
|
Vestas Wind Technology India Pvt. Ltd
|
CWP
|
Completed
|
59
|
Organized 'Wind India 2008' the second international conference-cum-exhibition at Chennai, focusing wind power sector developments in India (November, 2008)
|
Major stakeholders in Indian wind industry
|
CWP
|
Competed
|
60
|
Organized and conducted an International training programme on ‘Wind Farm Development & Financing’ in association with Garrad Hassan and Partners Limited, UK (November, 2008)
|
Major wind farm operators, developers, owners, researchers, investors and financial institutions associated with power sector
|
CWP
|
Completed
|
61
|
Induction Training Programme for Wind Power Professional (Nov.2007)
|
Vestas Wind Technology India Pvt. Ltd
|
CWP
|
Completed
|
62
|
Consultancy for setting up Green energy park at Maharashtra Nature Park, Mumbai
|
Mumbai Metropolitan Regional Development Authority (MMRDA)
|
CWP
|
Completed
|
63
|
Induction Training Programme for Wind Power Professional (July, 2006)
|
Vestas Wind Technology India Pvt Ltd
|
CWP
|
Completed
|
64
|
Organized 'Wind India 2006' the first-ever national conference-cum-exhibition held at Pune (August, 2006)
|
Major stakeholders in Indian wind industry
|
CWP
|
Completed
|
65
|
Published the book on ‘Wind Power Development in India’ by WISE Press (August, 2006)
|
In-house work
|
CWP
|
Completed
|
66
|
A Road Map for introduction of Production Tax Credit for wind power in India for MNRE, GoI.
|
Ministry of new and Renewable Energy, GOI
|
CWP
|
Completed
|
67
|
Training Programme for Wind Power Professional on ‘Supply Chain Management’
|
Vestas Wind Technology India Pvt. Ltd.
|
CWP
|
Completed
|
68
|
Undertook two academic projects, namely, ‘A study of performance monitoring of wind farms in Maharashtra’ ( June 2006) and ‘A study of power quality of grid integrated wind farms at Vankusawade near Satara districts of Maharashtra (December, 2006)
|
WISE in house studies
|
CWP
|
Completed
|
69
|
Third Party Vetting & Validation of Energy Estimation of 52.2 MW Wind Power Project
|
Super Wind Project Pvt. Ltd. Chennai
|
CWP
|
Completed
|
70
|
Organized and Conducted various technical & management training programmes for wind industry professionals
|
Wind power stakeholders
|
CWP
|
Completed
|
71
|
Third Party Vetting & Validation of Energy Estimation of 33.0 MW Wind Power Project.
|
Super Wind Project Pvt. Ltd. Chennai
|
CWP
|
Completed
|
72
|
Wind Power in India: Towards 5000 MW Annual Market by 2012 (A Comprehensive Survey on Market Potential, Industry Growth & Policy Development )
|
In-house Project
|
CWP
|
Completed
|
73
|
National survey on human resource (HR) needs of wind power sector in India till 2015
|
Suzlon Energy Ltd & Vestas Wind Technology (I)
|
CWP
|
Completed
|
74
|
Assessing the potential and implications for re-powering of wind turbines at two sites viz. Aralvoimozhi and Palghat pass in Tamil Nadu
|
Ministry of New and Renewable Energy (MNRE) India
|
CWP
|
Completed
|
75
|
A road map for introduction of Production Tax Credit (PTC) for Renewables in India
|
Ministry of New and Renewable Energy (MNRE) India
|
CWP
|
Completed
|
76
|
Preparation of feasibility cum Detailed Project Report (DPR) and Concept to commissioning technical and advisory support for 18 MW wind power project in Karnataka.
|
BEML Limited, Bangalore
|
CWP
|
Ongoing
|
77
|
A strategic road map for developing the market for small wind turbines and wind-solar hybrid systems in India.
|
Center for Wind Energy Technology (C-WET), Chennai
|
CWP
|
Completed
|
78
|
Training Programme for Wind Power Professional on ‘Project Management’ (July, 2006)
|
Vestas Wind Technology India Pvt Ltd
|
CWP
|
Completed
|
79
|
Induction Training Programme for Wind Power Professional (October, 2005)
|
Vestas Wind Technology India Pvt. Ltd
|
CWP
|
Completed
|