+91 20 26613832 / 26613855 wiseinfo@wisein.org

WISE assisted two industrial units, Hi-tech Carbon, a unit of Aditya Birla Group and Lloyds Metal and Engineering Ltd. (LMEL), in tariff determination of waste-heat-recovery based co-generation projects. Based on available inputs, WISE prepared the petition for project-specific tariff determination and presented the case before MERC. A case for renewable purchase obligation was also incorporated in the petition. WISE helped secure a favourable order from the MERC for the two industrial units.